Nyika-Vwaza Potable Water Supply Scheme, Malawi
Location: Nyika & Vwaza, Rumphi District, Malawi
Contract Sum: US$ 4,776,655.09
Contract Duration: 20th April 2023 - 15th June 2025
Client: Peace Parks Foundations
Consultants: EMD Consulting Engineers
Funded by: KfW
Contract Sum: US$ 4,776,655.09
Contract Duration: 20th April 2023 - 15th June 2025
Client: Peace Parks Foundations
Consultants: EMD Consulting Engineers
Funded by: KfW
Mzenga Irrigation Scheme
Location: Mzenga, Nkhata Bay, Malawi
Contract Sum: US$12,470,033.29
Contract Duration: 1st June 2023 – 15th May 2025
Client: Ministry of Agriculture, Government of Malawi
Consultants: KRC Consultants / DASAN / L GRAVAM
Funded by: IFAD
Contract Sum: US$12,470,033.29
Contract Duration: 1st June 2023 – 15th May 2025
Client: Ministry of Agriculture, Government of Malawi
Consultants: KRC Consultants / DASAN / L GRAVAM
Funded by: IFAD


Param Farm Water Supply
Location: Chipoka, Salima District, Malawi
Contract Sum: MWK 350,952,346.20
Contract Duration: 10 Weeks - 2025
Client: Param Farm
Funded By: Param Farm
Description of the work: Installation of a drip irrigation system from JAIN Irrigation inclusive of the following;
3 x 250mm diameter pipelines - 400m of HDPE on land and 330m of galvanised pipes into the lake, complete with 3 x 250mm Flowtech Foot Valves.
Contract Sum: MWK 350,952,346.20
Contract Duration: 10 Weeks - 2025
Client: Param Farm
Funded By: Param Farm
Description of the work: Installation of a drip irrigation system from JAIN Irrigation inclusive of the following;
3 x 250mm diameter pipelines - 400m of HDPE on land and 330m of galvanised pipes into the lake, complete with 3 x 250mm Flowtech Foot Valves.
Mozambique-Malawi Interconnection (MOMA)
Substation Works:
Location: Phombeya, Malawi
Contract Sum: $ 744,000
Contract Duration: April 2023 - Dec 2024
Client: L&T Construction Limited, India
Funded by: World Bank and KfW
OHL Works:
Location: Phombeya, Malawi
Contract Sum: $ 786,604.00
Contract Duration: April 2023 - August 2024
Client: L&T Construction Limited
Funded by: World Bank and KfW
Location: Phombeya, Malawi
Contract Sum: $ 744,000
Contract Duration: April 2023 - Dec 2024
Client: L&T Construction Limited, India
Funded by: World Bank and KfW
OHL Works:
Location: Phombeya, Malawi
Contract Sum: $ 786,604.00
Contract Duration: April 2023 - August 2024
Client: L&T Construction Limited
Funded by: World Bank and KfW


Maula Water Supply Scheme
Location: Nkhata Bay, Northern Region, Malawi
Contract Sum: MWK 3,274,785,018.07
Contract Duration: Dec 2022 - March 2024
Client: Northern Region Water Board, Malawi
Funded by: OPEC / AfDB & Malawi Government
Contract number : NRWB/NB/W03
Contract Sum: MWK 3,274,785,018.07
Contract Duration: Dec 2022 - March 2024
Client: Northern Region Water Board, Malawi
Funded by: OPEC / AfDB & Malawi Government
Contract number : NRWB/NB/W03
Mangochi Potable Water Supply Scheme
Location: Mangochi, Malawi
Contract Sum: $2,610,932.71
Contract Duration: Aug 2022 - July 2023
Client: Plem Construction Ltd / Southern Region Water Board, Malawi
Funded by: BADEA
Contract Sum: $2,610,932.71
Contract Duration: Aug 2022 - July 2023
Client: Plem Construction Ltd / Southern Region Water Board, Malawi
Funded by: BADEA


Construction of 60MW Solar PV Plant
Location: Salima District
Contract Sum: $ 4,145,706.84
Contract Duration: 10 months
Client: JCM Matswani Solar Power Corporation
Consultants: Zutari
Funded by: Infraco Africa
Contract Sum: $ 4,145,706.84
Contract Duration: 10 months
Client: JCM Matswani Solar Power Corporation
Consultants: Zutari
Funded by: Infraco Africa
Kamuzu Dam 1 Rehabilitation
This project entailed the raising, rehabilitation, and upgrade of the existing Kamuzu I Dam for the water supply of Lilongwe (Malawi). The main section was raised by 5 meters and the existing spillway now hosts a new pumping house and will be raised an additional 2m using a rubber dam. The reservoir storage was increased by five times from the original capacity from 5 Mm3 to 25 Mm3.
Description of the works:
1000mm diameter pipework and valve installation through the non-overflow section.
The stop log and trash rack through the non-overflow section.
Pumps and pipework in the pumphouse.
Electrical and generator
network of stainless-steel pipework connecting the blowers to the rubber dam.
Description of the works:
1000mm diameter pipework and valve installation through the non-overflow section.
The stop log and trash rack through the non-overflow section.
Pumps and pipework in the pumphouse.
Electrical and generator
network of stainless-steel pipework connecting the blowers to the rubber dam.